Least-Cost Pathway for India’s Power System Investments through 2030

This study assesses a least-cost and operationally feasible pathway for India’s electricity grid through 2030 that validates—and surpasses—India’s 2030 target of 500 GW of installed non-fossil capacity.
Policy and Regulatory Recommendations to Support a Least-Cost Pathway for India’s Power Sector

Estimating the Cost of Grid-Scale Lithium-Ion Battery Storage in India

Empirical Assessment of the Appliance-level Load Shape and Demand Response Potential in India
